Skip to main content

Council Approvals

Town Planner Penrith: Penrith Council DAs, CDCs and Approvals

EHUP is a Sydney town planning consultancy that prepares and lodges development applications and complying development certificates in the City of Penrith. We check your property against the Penrith LEP 2010 and DCP 2014 first, along with flood and bushfire mapping, which affect a lot of land out there. Then we prepare the application and deal with council until it is determined.

Free planning consultation

No obligation. We tell you what approval you actually need before you spend anything.

No obligation - first conversation is free.

Typical timeline
CDC 2 to 3 weeks where eligible · DA typically 6 to 10 weeks

Town planning in the City of Penrith

The City of Penrith takes in suburbs including Penrith, St Marys, Kingswood, Cambridge Park, Werrington, Cranebrook, Jordan Springs, Emu Plains, Glenmore Park, Mulgoa and Orchard Hills. The area mixes established suburbs, newer growth areas and semi-rural land, so the same project can play out very differently from one lot to the next. If you are looking for a Penrith council town planner, we start by reading the controls for your lot, then pick the pathway and build the application.

Flood, bushfire and the planning controls

Most Penrith lots are assessed under the Penrith Local Environmental Plan 2010 and the Penrith Development Control Plan 2014. Two constraints come up more here than in many other parts of Sydney.

Flooding. Land along the Nepean River and its creeks is flood affected. That can mean a flood assessment, a minimum floor level and limits on where the building sits. See our flood study report page for how that works.

Bushfire. Outer and semi-rural parts of the area include bushfire prone land. Whether your lot is bushfire prone, and what its BAL rating is, decides the construction standard and whether a CDC is still on the table. We cover that on the bushfire assessment page.

Land inside the Western Sydney Aerotropolis is a separate case. It has its own precinct plan and development control plan, and sites near the new airport can also have aircraft noise to deal with. If your lot is out that way, check which planning rules apply before you plan anything.

What we check first on a Penrith property

Before any drawings, we look at the zone and land use table, the height and floor space limits, the DCP controls for your type of development, and the flood, bushfire and heritage mapping. A section 10.7 planning certificate for your property states most of these, and we read it with you.

Approvals most often needed in Penrith

Say you own a 900 square metre lot in a semi-rural part of the area and want a granny flat. The lot is big enough, but it backs onto bushland. The bushfire assessment comes back at BAL-29, so the granny flat has to be built to that standard, but it can still go through as a CDC. If it had come back BAL-40, you would be into a DA. Finding that out before drawings is the whole point of the first check.

For the wider picture see town planners in Sydney and our guide to DAs in NSW.

How it works

  1. Free scope check

    Same or next business day

    Send us the address and what you want to do. We check the Penrith controls and tell you which pathway applies.

  2. Written scope and fixed fee

    Within 2 business days

    A written list of every document and report your application needs, with our fee for the work and council's fees shown separately.

  3. Documentation prepared

    2 to 4 weeks typically

    Planning report or SEE, drawings and any specialist reports such as flood or bushfire are coordinated on your behalf.

  4. Lodgement and council liaison

    DA typically 6 to 10 weeks

    We lodge through the Planning Portal and manage all correspondence until determination.

What we take off your hands

What EHUP handles

  • Checking the zoning, the Penrith LEP 2010, the DCP 2014 and any overlays on your property
  • Reading the flood and bushfire mapping before the design is fixed
  • Confirming the right pathway, exempt, CDC or DA, before you spend money on drawings
  • Preparing the planning report or Statement of Environmental Effects
  • Lodging through the NSW Planning Portal and answering council's requests for information

What you don't have to deal with

  • A design that has to be redrawn because of flood levels or a bushfire asset protection zone
  • Assuming a CDC is available, or ruled out, without checking the bushfire rating

Frequently asked questions

Does EHUP lodge applications with Penrith City Council?

Yes. We prepare the application, lodge it through the NSW Planning Portal and answer every request for further information, so council's questions come to us and not to you.

Which LEP and DCP apply to my Penrith property?

Most of the area is covered by the Penrith Local Environmental Plan 2010 and the Penrith Development Control Plan 2014. Land inside the Western Sydney Aerotropolis has its own precinct plan and development control plan, so the Penrith controls may not be the full picture there. We check which set applies to your lot first.

Will flood or bushfire stop my project in Penrith?

Not necessarily, but both change the design and the pathway. Flood affected land usually needs a flood assessment and set floor levels. Bushfire prone land needs a bushfire attack level assessment. A rating of BAL-29 or lower can still be certified as a CDC, while BAL-40 and flame zone sites need a DA. We check both before you commit to a design.

Do I need a DA or a CDC in Penrith?

It depends on the zoning of your lot, the controls that apply and any overlay. A project that meets every criterion can often be certified as a CDC in two to three weeks. One that needs a variation needs a DA. We check the property itself and tell you before you spend money on plans.

How long does a Penrith council DA take?

A typical DA takes six to ten weeks, but it varies with the size of the project, how many requests for information council raises and whether the site needs flood or bushfire referrals. We give you a realistic range after the first check and do not promise council's timing.

Development Application (DA)

A Development Application is the merit-assessed approval pathway.

Complying Development (CDC)

A complying development certificate (CDC) is a fast-track approval for building work that meets every criterion in the Codes SEPP, issued by council or a private certifier with no merit assessment.

Torrens / Strata Subdivisions

Subdividing land into separate Torrens titles, or subdividing a building into separately owned strata lots - for example splitting an approved dual occupancy or multi dwelling development into individually owned lots - is a distinct approval from the development consent for the dwellings themselves.

Town Planner

If you are about to buy a site, lease a shop or lodge plans with council, the first question is rarely who prepares the paperwork.

Parramatta Town Planner

EHUP is a Sydney town planning consultancy that prepares and lodges development applications and complying development certificates in the City of Parramatta.

Why clients choose EHUP

Years in NSW planning & environmental health
10+
Approvals lodged and managed
250+
NSW council areas serviced
17
Point of contact - planning + health, one firm
1

Not sure which approval you need?

Tell us the address and what you want to do. We'll help identify the appropriate planning pathway, whether it is exempt development, complying development or a full DA. Your first conversation is free.

CallWhatsApp