Skip to main content

New South Wales - servicing Sydney

Sydney town planners: council approval, handled from first check to determination

Most people come to us with one question: do I need approval for this, and how long will it take? EHUP answers that upfront, before you spend anything. We are town planners and environmental health consultants in one firm, so an alteration & addition, a new build, change of use, or a business you run from home all get handled end to end, without being referred elsewhere halfway through.

Which approval pathway are you in?

NSW splits every project into one of these. We confirm which one applies to your property before any work starts.

Check my property

Why clients choose EHUP

Years in NSW planning & environmental health
10+
Approvals lodged and managed
250+
NSW council areas serviced
17
Point of contact - planning + health, one firm
1

Council Approvals

Start with your development type

These are the pages most people land on. Each one explains what falls into the category, whether it is likely to be exempt, CDC or a DA, what it costs, and how long it takes.

Home Business Approvals

Most home-based businesses can be approved. If you are already operating and council has been in touch, that is usually fixable too - and it is much cheaper to sort out now than after an order is issued.

Unauthorised Use & Structures

Building work or a use that went ahead without approval can usually be brought into the system - through a building information certificate, a retrospective development application, or both. The important thing is timing.

Pre-Purchase Planning Check

Before you commit to a property, know what you're buying into. Our Pre-Purchase Planning Check gives you a clear, expert assessment of your site's development potential and its hidden pitfalls.

Food Premises Inspection

Opening, buying, or upgrading a food business? Our food safety consultants help you identify risks and compliance requirements before you commit - saving you time, money, and unnecessary delays. Every inspection is assessed against AS 4674-2004 (the Australian Standard for design, construction and fit-out of food premises) and the NSW Food Act 2003.

Change of Use

Changing what a building is used for? Check it is allowed before you sign the lease.

Retail to cafe, warehouse to gym, office to medical suite: the building stays the same but what happens inside it changes, and that usually needs approval. Some changes qualify as complying development and can be certified in two to three weeks. Others need a full DA.

We start with three questions, in order: is the new use permissible in the zone, what is the premises actually approved for today, and can the building support the new use. A change of use can also trigger accessibility, fire safety and Building Code upgrades, which is often the biggest cost, so it is far better to know before you commit.

CDC 2–3 weeks where eligible · DA 6–10 weeks · From $2,600 + GST (CDC)

Planning & Design

Reports and design for your DA package

Already mid-project, or an architect assembling a lodgement? We prepare planning reports and coordinate the specialist reports your DA needs, so you are managing one relationship instead of five.

Town planning reports

Preliminary Planning Assessment, Statement of Environmental Effects, Clause 4.6 variations and DCP justification.

Design services

Architectural documentation, stormwater, BASIX and NatHERS assessments.

Specialist reports we coordinate

Bushfire, heritage, traffic, acoustic, arborist, geotech, contamination and more.

Recent approvals

Real projects, real council areas.

Construction of Dual Occupancy and Torrens Subdivision (Land Size Shortfall), Campbelltown

Residential - dual occupancy & Torrens subdivision · Campbelltown LGA

Construction of Dual Occupancy and Torrens Subdivision (Land Size Shortfall)

Council requires a minimum of 700m² of land for a Torrens title subdivision of a dual occupancy in an R2 zone under Campbelltown City Council. The subject property comprises 655m², a shortfall of 45m². EHUP secured development approval despite this shortfall in land size.

Dual Occupancy (Retain One Dwelling, Demolish the Other) and Torrens Title Subdivision, Campbelltown

Residential - dual occupancy & Torrens subdivision · Campbelltown LGA

Dual Occupancy (Retain One Dwelling, Demolish the Other) and Torrens Title Subdivision

The owner wished to retain one of the two existing dwellings on the property, demolish the other (which was dilapidated), and construct a new detached double-storey dwelling, followed by a Torrens title subdivision of the resulting dual occupancy. EHUP was engaged and secured DA approval despite several points of non-compliance with the Campbelltown Development Control Plan.

Change of Use from Studio to Secondary Dwelling (Granny Flat), Campbelltown

Residential - secondary dwelling · Campbelltown LGA

Change of Use from Studio to Secondary Dwelling (Granny Flat)

Council issued a notice to cease use of the studio as a granny flat. The owner had purchased the property under the impression that the studio could be legally rented out. EHUP was engaged and secured DA approval despite a shortfall in the required land size for a granny flat under the Campbelltown Local Environmental Plan.

Regularisation of Continuing Use as a Community Facility (Islamic) at a Residential Dwelling, Ryde

Regularisation - community facility use · Ryde LGA

Regularisation of Continuing Use as a Community Facility (Islamic) at a Residential Dwelling

The residential dwelling had been used as an Islamic community centre, hosting congregational prayer, for more than 10 years. A number of unauthorised works had also been carried out to facilitate this use, and several prior applications had been rejected by Council. EHUP was engaged and successfully regularised the use of the community centre, together with all associated unauthorised structures.

All case studies

Google Reviews

What clients say

5.0 · 12 Google reviews

Abdullah was a lifesaver after a frustrating back-and-forth with Council. He was responsive, professional and easy to deal with, and made the whole process much less stressful. Really appreciate his help and wouldn't hesitate to recommend him!

Kapook Streaming

2 weeks ago

I honestly thought it was impossible to get council approval for my granny flat / secondary dwelling project. The team at EHUP Consultancy did a fantastic job. They really think outside the box and found a planning pathway when I thought there was none. Professional, knowledgeable, and great communication from start to finish. They handled everything with council and got us the approval. Highly recommend EHUP if you have a tricky project. Thank you team!

M Huq, Google reviewer

M Huq

4 weeks ago

Works hard to provide comprehensive reports to council.

Saad Odeh

4 weeks ago

Read all reviews on Google

Questions we get asked before anyone calls

Do I actually need a consultant, or can I lodge the application myself?

You can lodge it yourself. The reason people use a consultant is that most refusals and most delays come from an application that was incomplete or lodged in the wrong pathway, for example lodging a full DA for something that qualified as Complying Development, which costs weeks. We check the pathway first, then prepare the package so council has no reason to request more information.

How much does council approval cost through EHUP?

It depends on the pathway and the reports your site needs, so we quote a fixed fee after a free scope check rather than giving a number that changes later. Indicative ranges are published on each service page. Council lodgement fees are separate and paid directly to council.

How long does the whole process take?

A Complying Development Certificate can be as quick as 2–3 weeks where the project qualifies. A standard Development Application is typically 6–10 weeks with council, plus preparation time. Anything requiring referral to another agency, or a heritage or bushfire-affected site, takes longer.

I have already built something without approval. Is it too late?

Usually not, and acting early is much cheaper than responding to a council order. Unauthorised structures and unapproved uses can often be regularised through a building information certificate or a retrospective application. This is routine work for us, there is no judgement in the conversation.

Do you cover the health and food-safety side as well as planning?

Yes, and that is the main difference between EHUP and a planning-only consultancy. Home salons, skin penetration premises, cafes and catering businesses need both a planning approval and an environmental health or food-safety approval. We handle both, so nothing gets referred out mid-project.

Not sure which approval you need?

Tell us the address and what you want to do. We'll help identify the appropriate planning pathway, whether it is exempt development, complying development or a full DA. Your first conversation is free.

CallWhatsApp