Skip to main content

Council Approvals

CDC for Restaurants & Cafes: Complying Development in Sydney

Complying Development Certificate (CDC)

CDC stands for Complying Development Certificate: the fast-track approval that lets a cafe or restaurant fitout, and in many cases the change of use to a food premises, be certified in as little as two to three weeks where the premises satisfies the Codes SEPP in full. That is the fast-track most operators need. The part that catches people is the food safety side, which runs on a separate framework, and EHUP handles both in one scope.

Free planning consultation

No obligation. We tell you what approval you actually need before you spend anything.

No obligation - first conversation is free.

Typical timeline
2–3 weeks where the premises qualifies
Indicative fee
From $2,600 + GST plus certifier and food notification fees
Quoted fixed after a free scope check

A fitout that meets the criteria can be certified through one of our CDC packages, so you are not waiting on a council merit assessment while the lease clock runs.

The fast-track angle

For a food operator, weeks are rent. The complying development pathway exists precisely for premises that comply, and where it is available it is the difference between opening in a month and opening in a quarter.

If the premises is not yet approved for food use, see change of use. For the planning and notification side together, see food and drink premises approval. Before you commit to a lease or a purchase, a food premises inspection checks the fitout against AS 4674-2004 and the Food Act 2003.

What the food premises standards mean at fitout stage

Smooth, impervious, cleanable floors, walls and benches. A hand-washing basin dedicated to hand washing, in the food handling area. Adequate refrigeration with temperature monitoring. Mechanical exhaust over cooking equipment. A grease arrestor sized to the operation. Compliant waste and recycling storage with the space to hold it. Pest-proofing.

Each is inexpensive at design stage and expensive at inspection stage.

How it works

  1. Premises eligibility

    24–48 hours

    Zone, approved use, and whether the works and use fall within the code.

  2. Combined scope

    2–4 days

    Planning certification and food safety requirements in one programme, mapped to your opening date.

  3. Documentation

    1–2 weeks

    Fitout plans, mechanical and hydraulic requirements, and the food safety documentation.

  4. Certification and notification

    2–3 weeks

    CDC issued and food business notified, in parallel.

What we take off your hands

What EHUP handles

  • Eligibility check against the Codes SEPP for the specific premises
  • Fitout documentation to certifier standard
  • Food premises construction requirements designed in, not retrofitted
  • Food business notification and food safety program where required
  • Mechanical exhaust, grease arrestor and waste requirements
  • Managing the certifier and the health notification in parallel

What you don't have to deal with

  • Passing the planning certification and then failing a food premises inspection
  • Discovering the exhaust or grease requirement after the fitout is built

Frequently asked questions

What does CDC stand for in restaurants and cafes?

CDC stands for Complying Development Certificate. For a restaurant or cafe it means the fitout, and often the change of use to a food premises, is certified against a fixed set of criteria instead of going through a full development application. It is not a food licence: the food business notification and food safety requirements run separately, which is why we handle both together.

How much does a CDC for a cafe or restaurant cost?

Our scope starts from $2,600 + GST where the premises qualifies, plus certifier fees and food notification fees. Where the premises does not qualify, we tell you at the eligibility check, before you commit to a design or a lease.

Can my cafe fitout really be approved in three weeks?

Where the premises and the proposed use satisfy every applicable criterion, yes - that is the design intent of the complying development pathway. Eligibility depends on the zone, the existing approved use, and whether the works and the use fall within the code. Tell us your opening date at the first call and we will give you a straight answer.

What does the food safety side involve?

Notification of the business to council as a food business, and a premises that meets the food premises construction standards - cleanable surfaces, a dedicated hand- washing basin, adequate refrigeration, mechanical exhaust for cooking, a grease arrestor where required, and compliant waste storage. Most also need a certified food safety supervisor.

Do I need approval for outdoor seating?

Footpath dining on public land needs a separate approval from council, generally an outdoor dining licence, and it is distinct from the fitout approval. Seating within your own tenancy is part of the fitout capacity. Raise it early because it affects your seat count and therefore your business case.

What about the exhaust and grease arrestor?

Cooking equipment generally requires mechanical exhaust designed to the applicable standard and discharged appropriately, and food premises with grease-bearing waste require a grease arrestor sized to the operation. Both are cheaper to design into the fitout than to add afterwards, and both are inspected.

CDC - Retail & Office

Retail and office fitouts, and many changes of use within commercial premises, can be certified as complying development in two to three weeks where the premises satisfies the Codes SEPP.

Food and Drink Premises

Food and drink premises - cafes, restaurants and takeaway food shops - sit under two separate obligations that operators often assume are one process.

Food Premises Inspection

Opening, buying, or upgrading a food business? Our food safety consultants help you identify risks and compliance requirements before you commit - saving you time, money, and unnecessary delays.

Commercial & Industrial Approval

Commercial and light industrial projects span a wide range - from a cafe fitout that can be certified in two to three weeks, to a warehouse development where the capital at risk makes feasibility the first priority, not documentation.

Retail

A shop fitout within an already-approved retail use is frequently exempt development or complying development, and can move quickly.

Why clients choose EHUP

Years in NSW planning & environmental health
10+
Approvals lodged and managed
250+
NSW council areas serviced
17
Point of contact - planning + health, one firm
1

Not sure which approval you need?

Tell us the address and what you want to do. We'll help identify the appropriate planning pathway, whether it is exempt development, complying development or a full DA. Your first conversation is free.

CallWhatsApp